The French Accor Group is one of the world's largest hotel management groups and a leader in the European hotel industry. It has more than 4,000 hotels in 90 countries, and its brands include Sofitel, Novotel, and Ibis. We provided more than 5,000 sets of bathroom units for nearly 30 Ibis hotels.
Malaysia Top Holiday Hotel Project
Construction time: 2017-2018 Construction Place: Kuala Lumpur, Malaysia Quantity: 98 sets
Toyoko INN Hotel Group (Hotel Project)
Construction time: 2009-2019 Construction Place: Japan Quantity: More than 30000 sets
Burma Super Hotel Project
Construction time: 2015-2016 Construction Place: Yangon, Myanmar Quantity: 150 sets
OEM for HOUSETEC
Cooperation Time: 2012-2020 Partner Location: Japan Quantity: More than 50000 sets
Communication requirements & Quotes
Understand customer needs and provide appropriate quotations
Project site inspection
Under special conditions, the feasibility of the project should be inspected at the project site
Work out the design
Make reasonable design scheme according to customer demand
Delivery from factory
Check the product repeatedly and send it from the factory after confirmation
Prefab bathroom pod is a complete unit including every parts such as ceiling, wall, floor and sanitary ware. The ceiling, floor and walls are made of SMC(sheeting molding compound). It's high strength and light weight, been call aerial materials, usually used in airplane luggage and cabinets. The floor is one-step mold by press with high temperature and pressure. It's one-pieces with watertight performance.
Prefab bathroom pod is a complete unit including every parts such as ceiling, wall, floor and sanitary ware. The ceiling, floor and walls are made of SMC(sheeting molding compound). It's high strength and light weight, been call aerial materials, usually used in airplane luggage and cabinets. The floor is one-step mold by press with high temperature and pressure. It's one-pieces with watertight performance.
Prefab bathroom pod is a complete unit including every parts such as ceiling, wall, floor and sanitary ware. The ceiling, floor and walls are made of SMC(sheeting molding compound). It's high strength and light weight, been call aerial materials, usually used in airplane luggage and cabinets. The floor is one-step mold by press with high temperature and pressure. It's one-pieces with watertight performance.